Where other SAP EWM projects get stuck, we make the difference.
Most SAP EWM projects start configuring too early.
Yet it is precisely during preparation that the biggest mistakes, and therefore costs, arise.
That is why we start with a thorough analysis 4 to 6 weeks before implementation.
In this phase, we identify:
- The operational wishes and requirements
- The low-hanging fruit
- The potential savings, calculated in euros (ROI)
- Where processes can be improved
- Better utilisation of warehouse space
- Which configuration choices affect performance, error risk and storage (cause and effect)
This analysis creates:
- A clear project roadmap
- Providing high-level business case with an ROI upfront.
This ensures that the implementation is not only technically sound, but also aligned with real-world operations, preventing costly adjustments during the project.